Skip to main content

Pre Header

  • FAQ
  • Permits and District Business
  • Valley Water Websites
Home

Main navigation

    • FAQ
    • Permits and District Business
    • Valley Water Websites
  • For Residents
    Highlights
    Access Valley Water
    Easily send requests, reports or feedback directly to helpful district staff.
    Rebates & Surveys
    Programs and rebates helping you save water and money.
    Water Conservation
    Learn the best ways to save water indoors and outdoors.
    Current Water Charges
    Valley Water is funded by property taxes, well owners, agricultural water customers and water retailers like San Jose Water Company
    Emergency & Planning
    Flood Emergency Action Plans
    Drought Information
    Local Hazard Mitigation Plan
    Get Flood Ready
    Preparation for Extended Power Outages
    Alert System Real Time Data*
    Levee Safety
    Save Water & Money
    Rebates & Surveys
    Watersavings.org
    Current Water Charges
    Water Savings Videos
    Indoor Conservation
    Outdoor Conservation
    Projects & Plans
    Projects In Your Neighbourhood
    Creek & River Projects
    Dam & Reservoir Projects
    Grants and Environmental Protection
    Infrastructure Improvement Projects
    Climate Change Action Plan
    Safe, Clean Water and Natural Flood Protection Programs
    Studies and Reports
    Hydraulic Model Data (HEC)
    Stream Maintenance Program
  • Your Water
    Highlights
    Access Valley Water
    Easily send requests, reports or feedback directly to helpful district staff.
    Current Water Charges
    Valley Water is funded by property taxes, well owners, agricultural water customers and water retailers like San Jose Water Company
    Rebates & Surveys
    Programs and rebates helping you save water and money.
    Water Conservation
    Learn the best ways to save water indoors and outdoors.
    Water Sources
    Groundwater
    Imported Water
    Local Dams and Reservoirs
    Recycled and Purified Water
    Where your water comes from
    Information & Resources
    GIS Data
    Glossary of Water Terms
    District Library
    Popular Documents and Data
    Local Dams and Reservoirs
    Water Planning
    Water Supply Master Plan
    Water Supply Planning
    Water Treatment
    Water Treatment Plants
    Water Quality
  • Learning Center
    Highlights
    Access Valley Water
    Easily send requests, reports or feedback directly to helpful district staff.
    Rebates & Surveys
    Programs and rebates helping you save water and money.
    Water Conservation
    Learn the best ways to save water indoors and outdoors.
    Current Water Charges
    Valley Water is funded by property taxes, well owners, agricultural water customers and water retailers like San Jose Water Company
    Learning & Exploration
    Next Gen Career Pathways Program
    Water Education programs and Events
    Water 101 Academy
    Public Tours
    Local Dams and Reservoirs
    Volunteer Engagement
    Volunteer and Engage
    Valley Water Youth
    Commission
    Adopt a Creek
    Grants & Partnerships
    Public Art
    Environmental Science & Conservation
    Healthy Creeks and Ecosystems
    Watersheds of Santa Clara Valley
    The Water Treatment Process
    Aerial Drone Pilot Program
  • News & Events
    Highlights
    District News
    Learn more about the latest headlines and announcements from around the district
    Events
    Find district events happening on variety of topics
    Valley Water News Blog
    Catch up on all the latest list of articles and blog posts
    Videos
    Stay up to date with the latest videos from the district
    Public Records
    Public Records feature many commonly requested documents and data sets.
    Recent News
    Image
    Box culvert in West Little Llagas Creek
    A look at a completed flood wall as part of the Coyote Creek Flood Management Measures Project.
    January 23, 2026
    Valley Water’s annual Capital Improvement Program: Projects to reduce flood risk 

    Editor’s Note: This is the first in a three-part series highlighting some of the projects included in the Capital Improvement Program Fiscal Year 2027-2031 Preliminary Five-Year Plan.

    Read More
    Image
    Valley Water completes erosion repair project along Saratoga Creek in fall 2025
    January 21, 2026
    Providing flood protection through ongoing stream maintenance projects

    Each summer, under the Stream Maintenance Program (SMP), Valley Water takes important steps to protect neighborhoods from flooding. Over time, sediment can accumulate in creeks, reducing their capacity to carry stormwater. During heavy rains, this can lead to an increased risk of flooding for nearby homes, roads and businesses.

    Read More
    Image
    Mockups Design
    January 7, 2026
    Discover how Valley Water is building climate resilience; read the latest biennial report

    Valley Water’s mission is to provide safe, clean water, protect against flooding, and care for local streams. Climate change is affecting this mission. Rising temperatures, changing rainfall patterns, more severe droughts, a declining Sierra Nevada snowpack and rising sea levels all impact water reliability, infrastructure, and ecosystem health throughout Santa Clara County.

    Read More
  • About Valley Water
    Highlights
    Mission, Vision and Values
    Learn about our core mission, vision for the future, and the values that guide us
    Board of Directors
    Meet the board members who provide leadership and oversight for the district
    Finance/Budget
    Access financial information, budgets, and fiscal reports for transparency
    Committees
    Explore our various committees and their roles in district governance
    Board Meetings, Agendas & Minutes
    Review meeting schedules, agendas, and official minutes from board meetings
    Leadership
    Board of Directors
    Board Meetings Agendas & Minutes
    Committees
    Redistricting
    Board Governance Policies
    Accountability
    Public Records
    Lobbyist Ordinance
    Grand Jury Reports
    Enterprise Systems
    Information & Resources
    Finance/Budget
    Capital Improvement Program
    Public Facilities Financing Corporation
    Community Engagement
    Renewed Safe, Clean Water & Natural Flood Protection: Independent Monitoring Committee
    Committees
    Community Partnering Sponsorship Program
  • Services and Support
Loading…
Home

Main navigation

    • FAQ
    • Permits and District Business
    • Valley Water Websites
  • For Residents
    Highlights
    Access Valley Water
    Easily send requests, reports or feedback directly to helpful district staff.
    Rebates & Surveys
    Programs and rebates helping you save water and money.
    Water Conservation
    Learn the best ways to save water indoors and outdoors.
    Current Water Charges
    Valley Water is funded by property taxes, well owners, agricultural water customers and water retailers like San Jose Water Company
    Emergency & Planning
    Flood Emergency Action Plans
    Drought Information
    Local Hazard Mitigation Plan
    Get Flood Ready
    Preparation for Extended Power Outages
    Alert System Real Time Data*
    Levee Safety
    Save Water & Money
    Rebates & Surveys
    Watersavings.org
    Current Water Charges
    Water Savings Videos
    Indoor Conservation
    Outdoor Conservation
    Projects & Plans
    Projects In Your Neighbourhood
    Creek & River Projects
    Dam & Reservoir Projects
    Grants and Environmental Protection
    Infrastructure Improvement Projects
    Climate Change Action Plan
    Safe, Clean Water and Natural Flood Protection Programs
    Studies and Reports
    Hydraulic Model Data (HEC)
    Stream Maintenance Program
  • Your Water
    Highlights
    Access Valley Water
    Easily send requests, reports or feedback directly to helpful district staff.
    Current Water Charges
    Valley Water is funded by property taxes, well owners, agricultural water customers and water retailers like San Jose Water Company
    Rebates & Surveys
    Programs and rebates helping you save water and money.
    Water Conservation
    Learn the best ways to save water indoors and outdoors.
    Water Sources
    Groundwater
    Imported Water
    Local Dams and Reservoirs
    Recycled and Purified Water
    Where your water comes from
    Information & Resources
    GIS Data
    Glossary of Water Terms
    District Library
    Popular Documents and Data
    Local Dams and Reservoirs
    Water Planning
    Water Supply Master Plan
    Water Supply Planning
    Water Treatment
    Water Treatment Plants
    Water Quality
  • Learning Center
    Highlights
    Access Valley Water
    Easily send requests, reports or feedback directly to helpful district staff.
    Rebates & Surveys
    Programs and rebates helping you save water and money.
    Water Conservation
    Learn the best ways to save water indoors and outdoors.
    Current Water Charges
    Valley Water is funded by property taxes, well owners, agricultural water customers and water retailers like San Jose Water Company
    Learning & Exploration
    Next Gen Career Pathways Program
    Water Education programs and Events
    Water 101 Academy
    Public Tours
    Local Dams and Reservoirs
    Volunteer Engagement
    Volunteer and Engage
    Valley Water Youth
    Commission
    Adopt a Creek
    Grants & Partnerships
    Public Art
    Environmental Science & Conservation
    Healthy Creeks and Ecosystems
    Watersheds of Santa Clara Valley
    The Water Treatment Process
    Aerial Drone Pilot Program
  • News & Events
    Highlights
    District News
    Learn more about the latest headlines and announcements from around the district
    Events
    Find district events happening on variety of topics
    Valley Water News Blog
    Catch up on all the latest list of articles and blog posts
    Videos
    Stay up to date with the latest videos from the district
    Public Records
    Public Records feature many commonly requested documents and data sets.
    Recent News
    Image
    Box culvert in West Little Llagas Creek
    A look at a completed flood wall as part of the Coyote Creek Flood Management Measures Project.
    January 23, 2026
    Valley Water’s annual Capital Improvement Program: Projects to reduce flood risk 

    Editor’s Note: This is the first in a three-part series highlighting some of the projects included in the Capital Improvement Program Fiscal Year 2027-2031 Preliminary Five-Year Plan.

    Read More
    Image
    Valley Water completes erosion repair project along Saratoga Creek in fall 2025
    January 21, 2026
    Providing flood protection through ongoing stream maintenance projects

    Each summer, under the Stream Maintenance Program (SMP), Valley Water takes important steps to protect neighborhoods from flooding. Over time, sediment can accumulate in creeks, reducing their capacity to carry stormwater. During heavy rains, this can lead to an increased risk of flooding for nearby homes, roads and businesses.

    Read More
    Image
    Mockups Design
    January 7, 2026
    Discover how Valley Water is building climate resilience; read the latest biennial report

    Valley Water’s mission is to provide safe, clean water, protect against flooding, and care for local streams. Climate change is affecting this mission. Rising temperatures, changing rainfall patterns, more severe droughts, a declining Sierra Nevada snowpack and rising sea levels all impact water reliability, infrastructure, and ecosystem health throughout Santa Clara County.

    Read More
  • About Valley Water
    Highlights
    Mission, Vision and Values
    Learn about our core mission, vision for the future, and the values that guide us
    Board of Directors
    Meet the board members who provide leadership and oversight for the district
    Finance/Budget
    Access financial information, budgets, and fiscal reports for transparency
    Committees
    Explore our various committees and their roles in district governance
    Board Meetings, Agendas & Minutes
    Review meeting schedules, agendas, and official minutes from board meetings
    Leadership
    Board of Directors
    Board Meetings Agendas & Minutes
    Committees
    Redistricting
    Board Governance Policies
    Accountability
    Public Records
    Lobbyist Ordinance
    Grand Jury Reports
    Enterprise Systems
    Information & Resources
    Finance/Budget
    Capital Improvement Program
    Public Facilities Financing Corporation
    Community Engagement
    Renewed Safe, Clean Water & Natural Flood Protection: Independent Monitoring Committee
    Committees
    Community Partnering Sponsorship Program
  • Services and Support
Loading…
  • Almaden Lake Improvement Project
  • Canal Maintenance Program
  • Lower Berryessa Creek Flood Protection
  • Lower Berryessa Creek Flood Protection (Phase 3)*
  • Upper Berryessa Creek Flood Protection*
  • Calabazas Creek Bank Rehabilitation Project
  • Calabazas/San Tomas Aquino Creek-Marsh Connection Project
  • Coyote Creek Flood Protection*
  • Cunningham Flood Detention Certification
  • Ecological Data Collection and Analysis*
  • FAHCE: Fish and Aquatic Habitat Collaborative Effort
    • FAHCE Final Program Environmental Impact Report
    • FAHCE-Related Board Committee Items
    • FAHCE: Adaptive Management Program
    • FAHCE: Fish Monitoring Program
    • FAHCE-Related Board Agenda Items
    • FAHCE: Certified Final EIR
  • Fish Habitat and Passage Improvement*
  • Flood Risk Assessment Studies*
  • Lower Guadalupe River Project
  • Upper Guadalupe River Flood Protection*
  • Interagency Urban Runoff Program*
  • Upper Llagas Creek Flood Protection*
  • Palo Alto Flood Basin Tide Gate Structure Replacement Project
  • Upper Penitencia Creek Flood Protection*
  • Lower Penitencia Creek Improvements Project
  • Restoration of Natural Creek Functions*
  • Permanente Creek Flood Protection*
  • San Francisco Bay Shoreline Protection*
  • San Francisquito Creek: Bay to Highway 101
  • San Francisquito Creek Flood Protection*
  • Saratoga Creek Hazard Tree Removal and Restoration Project
  • Sediment Reuse to Support Shoreline Restoration*
  • Sunnyvale East and Sunnyvale West Channels Flood Protection*
  • Vegetation Control and Sediment Removal for Capacity*
  • Vegetation Management for Access and Fire Safety*
  • Uvas Creek Levee Rehabilitation

Breadcrumb

  1. Home
  2. Project Updates
  3. E6: Upper Llagas Creek Flood Protection*

E6: Upper Llagas Creek Flood Protection*

Image
Upper Llagas Creek Project
Status
Active; Adjusted
Phase
Construction
Location
Morgan Hill, San Martin and Gilroy
Schedule
Start FY 2022 / Finish FY 2027
Funding
Safe, Clean Water Fund ($248.9 million); Watershed Stream Stewardship Fund; State of California; City of Morgan Hill

Preferred project: A federal-state-local partnership

This project continues a partnership with the U.S. Army Corps of Engineers (USACE) and the State of California to plan, design and construct improvements along 13.9 miles of channel. The project extends from Buena Vista Avenue to Llagas Road and includes West Little Llagas Creek in downtown Morgan Hill. The federally authorized preferred project protects the urban area of Morgan Hill from a 1% flood (100-year event) and reduces the frequency of flooding in surrounding areas. Construction includes channel modifications and replacement of road crossings. Valley Water continues to work with Congress to aggressively pursue federal funds to bring this project to full fruition.

Local-funding-only project

Construct flood protection improvements along Llagas Creek from Buena Vista Avenue to Highway 101 in San Martin (Reaches 4 and 5), Monterey Road to Watsonville Road in Morgan Hill (Reach 7a), approximately W. Dunne Avenue to W. Main Avenue (a portion of Reach 8), and onsite compensatory mitigation at Lake Silveira.

*This project was voter approved as part of the Safe, Clean Water and Natural Flood Protection Program.

Valley Water begins construction of the final phase
Valley Water began construction on Phase 2B, the final phase of the Upper Llagas Creek Flood Protection Project, in September 2024. This phase includes improvements on approximately eight (8) miles of Upper Llagas Creek, from US 101 upstream to Llagas Road. Phase 2B is scheduled for completion in spring 2027. Once completed, approximately 1,100 homes, 500 businesses, and over 1,300 acres of agricultural land will be protected from the 100-year flood. The Phase 2B mailer is available with details about the work scheduled for each of the four reaches where construction will occur. 
Bridge Moved to Allow for Flood Protection Work
Valley Water relocated a pedestrian bridge to make room for major flood protection improvements along West Little Llagas Creek, ensuring both safety and continued trail access for the community. The bridge was moved to Edmundson Creek, near its connection with West Little Llagas Creek. This move enables the bridge to remain part of Morgan Hill’s trail system, providing walkers, joggers and cyclists with a scenic and safe crossing.

The original bridge location along West Little Llagas Creek was realigned to connect with new flood protection channels beneath Watsonville Road and Middle Avenue. These upgrades will help reroute high water flows during storms, reducing the risk of flooding for nearby homes and businesses. To see a video of the bridge being lifted and moved to its new location, click here.
Hale Avenue Temporary Closure through December 2025

A section of Hale Ave. between Main Avenue and Wright Avenue will continue to be closed through December 2025 for construction and paving. The opening date could be extended should inclement weather delay work. Crews are working quicky and safely to repone the street.  A box culvert is similar to a square-shaped underground tunnel. The two 10-foot wide by 9-foot high culverts will replace West Little Llagas Creek along the eastern side of Hale Avenue to convey a 100-year storm, which has a 1% chance of occurring once a year.

Crews will work from 7:00 a.m. to 8:00 p.m. Monday through Friday and 9:00 a.m. to 6:00 p.m. on Saturdays. The map on the right provides detour information. 

Access to the Morgan Hill Shopping Center remained open on Main Avenue, but access from Hale Avenue was only open from the first driveway near the donut shop through July 2025.  Hale Avenue was reopened in August adjacent to the shopping center, though the remainder of Hale Avenue north to Wright Avenue remains closed through November 2025. The entrance to the Park Plaza Professional Center will be on Crest Avenue until Hale Avenue entrance is reopened in December 2025. 

A curb, gutter, and sound wall will also be constructed on the east side of Hale Avenue, and the existing overhead utility lines along the west side of Hale Avenue will be relocated underground. Valley Water’s contractor will also re-construct the west side sidewalk, driveways, and curb and gutters.

Hale Ave. North of Wright Ave Closed through December 2025
Crews are working at the northwest intersection of Hale and Wright avenues, to construct a new sanitary sewer line that will be compatible with the flood protection improvements, scheduled for construction in summer 2026.

To safely complete this work, Hale Ave. north of Wright Ave. is closed to vehicle traffic in both directions. Wright Ave. is reduced to one lane in each direction as it approaches Hale Ave. and left or right turns from Wright Ave. to Hale Ave. are not be allowed.

Residents along Hale Ave., north of Wright Ave., can use Llagas Rd, and Old Monterey Rd. to reach Monterey Rd. The closure and detour are expected to be in place through December 2025, weather and conditions permitting. Hale and Wright avenues will be reopened once this work is completed.

Edes Street and Trail Closures (through late December 2025)
Valley Water began construction in 2025 and is working through December 2025 to build new box culverts where West Little Llagas Creek crosses under Cosmo Avenue and Edes Street. This work requires a partial closure of Edes Street. For public safety, the West Little Llagas Creek Trail on the above-mentioned roads will also be closed.

Edes Street and the trails will reopen by the end of December 2025. The reopening dates may shift due to inclement weather delaying construction activity. Click here to view the project mailer with additional details and maps of the street and trail detours. Crews will work weekdays from 7:00 a.m. to 8:00 p.m. and Saturdays from 9:00 a.m. to 6:00 p.m. when needed. 

Construction Activities for November 2025 to May 2026
The following flood protection improvements are anticipated for upcoming construction between November 2025 and May 2026:

  1. Construction of a new sewer siphon within the intersection of Hale Avenue and Wright Avenue required the closure of Hale Avenue north of Wright Avenue for approximately 10 weeks.

  2. Water main relocation at Edmundson Drive.

  3. Installation of new curb, gutters, driveways, and asphalt paving at Edes, Cosmo, and Hale Avenues.

  4. Underground utility relocations along Hale Avenue between West Main Avenue and Wright Avenue.

  5. Construction of a new City soundwall along the east side of Hale Avenue north to Wright Avenue. 

Phase 2B Construction during Summer 2026 (May 2026 to October 2026)

  1. West Little Llagas Creek widening and deepening from Watsonville Road to Ciolino Avenue (Reach 7B), where the existing trails will be closed during construction.

  2. West Little Llagas Creek widening and deepening from Hillwood Lane to Llagas Road (Reach 8).

  3. Underground twin box culvert construction through the intersection of Hale Avenue and Wright Avenue, including utility relocations

    1. Work requires full closure of the intersection of Hale Avenue and Wright Avenue beginning May 1, 2026.

  4. Spring Avenue box culvert construction which will require the closure of both lanes on Spring Ave. at West Little Llagas Creek and the adjoining trail.

Prior to May 1, 2026, additional public outreach will be conducted to inform the public of this upcoming work.

Here is a social media post explaining the work and a postcard with details about the work.

Project Information

The project is being constructed in several phases, each with specific sections (referred to as reaches on the map) where the proposed improvements will occur. Phase 1 was completed in April 2022, including creating a new wetland habitat at Lake Silveira and planting more than 45,000 native plants along the widened and deepened channel. In August 2024, Valley Water completed Phase 2A of the project, including constructing a 2,300-foot-long tunnel underneath downtown Morgan Hill. The final phase of the project, Phase 2B, is now under construction and expected to be completed in 2027.

The Phase 2B mailer is available with details about the work scheduled for each of the four reaches where construction will occur. 

Phase 1: Complete

Phase 1 of the Upper Llagas Creek Flood Protection Project was completed ahead of schedule in April 2022. Phase 1 project work included 4.4 miles of channel excavation, construction of the on-site compensatory mitigation at Lake Silveira wetlands, Masten Avenue Bridge concrete underpinning, Monterey Road Bridge concrete lining with a low flow channel for fish passage, installation of rock slope protection, storm drain outfall modifications, removal of concrete rubble, debris, and legacy trash, destruction of monitoring wells, installation of bat boxes, installation of permanent fencing and gates, removal of 12.5 acres of invasive blackberry bushes at Lake Silveira, planting of approximately 45,000 new, native plants on approximately 50 acres of Valley Water project property, and restoration of 2,000 linear feet of Llagas Creek adjacent to Lake Silveira The three-year native plant establishment and maintenance period was completed in March 2025.  Phase 1 construction contract Notice of Completion was accepted by the Valley Water Board of Directors on June 10, 2025.
Valley Water created a video of the completed wetlands and Llagas Creek restoration work. A story on this work is also available on the Valley Water News blog. 

In the 1970s, Lake Silveira was an active quarry, and presumably, as a result of those operations, there was a significant amount of abandoned concrete rubble dispersed on and adjacent to Llagas Creek. Valley Water removed the rubble and created new wetlands. The wetland habitat at Lake Silveira included creating islands, constructing habitat features, constructing side-weir inlet and outlet structures, and planting thousands of native wetland and riparian plants that will become habitat for birds, frogs, turtles, and other wildlife. The Land Trust of Santa Clara Valley is Valley Water’s long-term land management partner of the Lake Silveira wetlands.

During the 2020 and 2021 in-channel construction seasons, approximately 600,000 cubic yards (CY) of soil was excavated and removed from Upper Llagas Creek from Reaches 4, 5, 7A, and a portion of Reach 6 to increase the capacity of the creek channel during storm events. Rock slope protection was placed at existing bridge abutments for erosion and scour protection. Approximately 75,000 CY of nutrient-rich topsoil was placed along the creek banks to help support the dozens of acres of newly planted native riparian vegetation. Instream complexities, such as coarse woody debris and rootwad-log structures, were installed along the creek bottom throughout Phase 1 to serve as future habitat for native wildlife.

Valley Water entered into a cost-sharing agreement with the City of Morgan Hill in October 2020 to construct a public trail within Reach 7A.  Valley Water completed the paved trail on behalf of the city. The city completed the construction of new pedestrian crosswalks at Middle Avenue and Watsonville Avenue. The project is an example of Valley Water’s commitment to restoring wildlife habitat and providing open space for public use.

Phase 2A: Complete

Phase 2A construction began in June 2021 in a portion of Reach 8 in downtown Morgan Hill. Phase 2A included approximately 2,300 linear feet of a horseshoe-shaped underground tunnel 14 x 12 feet and approximately 1,600 linear feet of 10 ft x 9 ft twin reinforced concrete box culverts upstream and downstream of the tunnel to carry high water flows. Low flows will remain within the existing creek that traverses through downtown Morgan Hill.  The Phase 2A construction contract Notice of Completion was accepted by the Valley Water Board of Directors on January 28, 2025.

Valley Water entered into a cost-sharing agreement with the City of Morgan Hill in April 2021 to construct an approximate 600-foot portion of the City’s Hale Avenue Extension Project, including a fully signalized intersection at West Main Avenue as part of Phase 2A. Valley Water utilized the City property as a staging area to construct the necessary flood protection improvements. Phase 2A is an example of the cooperation and commitment of Valley Water and the City to save public funds while minimizing impacts to the community.

Phase 2B: in construction through spring 2027

Phase 2B construction consists of approximately 1,900 linear feet of twin reinforced concrete box culverts (10 ft x 9 ft), creek modifications and excavation by widening and deepening, installation and modification of culverts at various street crossings, construction of an inlet basin weir split-flow structure to divert high creek flows, and support of existing bridges by underpinning. Valley Water will construct improvements on approximately eight (8) miles of Upper Llagas Creek, from US 101 upstream to Llagas Road. Construction will include creek widening and deepening, bridge/culvert construction, traffic control, utility coordination and relocation, construction of maintenance roads, and habitat enhancements. Construction is expected to be completed in spring 2027.

After the project's completion in spring 2027, a three-year post-construction mitigation native plant revegetation period will follow.
Valley Water and Boy Scout Troop 730 
In May 2023, Morgan Hill Boy Scout Troop 730 constructed a bat roost adjacent to Lake Silveira. The construction was the culmination of many days of planning and preparation for the bat roost. Approximately 15 troop and community members helped at various stages of the project.

Scout Troop 730 searches for a location to install the bat roost.
Scout Troop 730 searches for a location to install the bat roost.
Scout digs the hole for the post.
Scout digs the hole for the post.

Scouts working at the site

Volunteers and troops design the bat roost.

Volunteers and troops design the bat roost

Volunteers help with the roost.

Volunteers help with the roost

The bat roost is done and installed. THANK YOU!

For more information:

  • Stephen M. Ferranti, P.E., (408) 630-2677
     
  • Jose Villarreal, (408) 630-2879
     
  • Sign up to receive project updates via email.
     
  • Use "Access Valley Water" to submit questions, complaints or compliments.
Safe Clean Water and Natural Flood Protection Interactive Map

 

Hale Avenue detour to be in place through the end of October 2025.

 

Detour map for Edes St., Cosmo Ave., and Spring Ave. closures.

 

Temporary West Little Llagas Creek trail entrances closures and detour.

 

Map of the various reaches where flood protection elements are being built. Click to enlarge the map.

 

Newly planted wetland and upland plants at Valley Water’s recently created Lake Silveira wetlands near Llagas Creek and Monterey Road in Morgan Hill (April 2022)
Newly planted wetland and upland plants at Valley Water’s recently created Lake Silveira wetlands near Llagas Creek and Monterey Road in Morgan Hill (April 2022)

 

Upper Llagas Phase 1 bridge underpinning (June 2020)
Upper Llagas Phase 1 bridge underpinning (June 2020)

 

Upper Llagas Phase 2A finished tunnel
Upper Llagas Phase 2A finished tunnel

 

Upper Llagas Phase 2A RCB construction
Upper Llagas Phase 2A RCB construction

Valley Water begins construction of the final phase
Valley Water began construction on Phase 2B, the final phase of the Upper Llagas Creek Flood Protection Project, in September 2024. This phase includes improvements on approximately eight (8) miles of Upper Llagas Creek, from US 101 upstream to Llagas Road. Phase 2B is scheduled for completion in spring 2027. Once completed, approximately 1,100 homes, 500 businesses, and over 1,300 acres of agricultural land will be protected from the 100-year flood. The Phase 2B mailer is available with details about the work scheduled for each of the four reaches where construction will occur. 
Bridge Moved to Allow for Flood Protection Work
Valley Water relocated a pedestrian bridge to make room for major flood protection improvements along West Little Llagas Creek, ensuring both safety and continued trail access for the community. The bridge was moved to Edmundson Creek, near its connection with West Little Llagas Creek. This move enables the bridge to remain part of Morgan Hill’s trail system, providing walkers, joggers and cyclists with a scenic and safe crossing.

The original bridge location along West Little Llagas Creek was realigned to connect with new flood protection channels beneath Watsonville Road and Middle Avenue. These upgrades will help reroute high water flows during storms, reducing the risk of flooding for nearby homes and businesses. To see a video of the bridge being lifted and moved to its new location, click here.
Hale Avenue Temporary Closure through December 2025

A section of Hale Ave. between Main Avenue and Wright Avenue will continue to be closed through December 2025 for construction and paving. The opening date could be extended should inclement weather delay work. Crews are working quicky and safely to repone the street.  A box culvert is similar to a square-shaped underground tunnel. The two 10-foot wide by 9-foot high culverts will replace West Little Llagas Creek along the eastern side of Hale Avenue to convey a 100-year storm, which has a 1% chance of occurring once a year.

Crews will work from 7:00 a.m. to 8:00 p.m. Monday through Friday and 9:00 a.m. to 6:00 p.m. on Saturdays. The map on the right provides detour information. 

Access to the Morgan Hill Shopping Center remained open on Main Avenue, but access from Hale Avenue was only open from the first driveway near the donut shop through July 2025.  Hale Avenue was reopened in August adjacent to the shopping center, though the remainder of Hale Avenue north to Wright Avenue remains closed through November 2025. The entrance to the Park Plaza Professional Center will be on Crest Avenue until Hale Avenue entrance is reopened in December 2025. 

A curb, gutter, and sound wall will also be constructed on the east side of Hale Avenue, and the existing overhead utility lines along the west side of Hale Avenue will be relocated underground. Valley Water’s contractor will also re-construct the west side sidewalk, driveways, and curb and gutters.

Hale Ave. North of Wright Ave Closed through December 2025
Crews are working at the northwest intersection of Hale and Wright avenues, to construct a new sanitary sewer line that will be compatible with the flood protection improvements, scheduled for construction in summer 2026.

To safely complete this work, Hale Ave. north of Wright Ave. is closed to vehicle traffic in both directions. Wright Ave. is reduced to one lane in each direction as it approaches Hale Ave. and left or right turns from Wright Ave. to Hale Ave. are not be allowed.

Residents along Hale Ave., north of Wright Ave., can use Llagas Rd, and Old Monterey Rd. to reach Monterey Rd. The closure and detour are expected to be in place through December 2025, weather and conditions permitting. Hale and Wright avenues will be reopened once this work is completed.

Edes Street and Trail Closures (through late December 2025)
Valley Water began construction in 2025 and is working through December 2025 to build new box culverts where West Little Llagas Creek crosses under Cosmo Avenue and Edes Street. This work requires a partial closure of Edes Street. For public safety, the West Little Llagas Creek Trail on the above-mentioned roads will also be closed.

Edes Street and the trails will reopen by the end of December 2025. The reopening dates may shift due to inclement weather delaying construction activity. Click here to view the project mailer with additional details and maps of the street and trail detours. Crews will work weekdays from 7:00 a.m. to 8:00 p.m. and Saturdays from 9:00 a.m. to 6:00 p.m. when needed. 

Construction Activities for November 2025 to May 2026
The following flood protection improvements are anticipated for upcoming construction between November 2025 and May 2026:

  1. Construction of a new sewer siphon within the intersection of Hale Avenue and Wright Avenue required the closure of Hale Avenue north of Wright Avenue for approximately 10 weeks.

  2. Water main relocation at Edmundson Drive.

  3. Installation of new curb, gutters, driveways, and asphalt paving at Edes, Cosmo, and Hale Avenues.

  4. Underground utility relocations along Hale Avenue between West Main Avenue and Wright Avenue.

  5. Construction of a new City soundwall along the east side of Hale Avenue north to Wright Avenue. 

Phase 2B Construction during Summer 2026 (May 2026 to October 2026)

  1. West Little Llagas Creek widening and deepening from Watsonville Road to Ciolino Avenue (Reach 7B), where the existing trails will be closed during construction.

  2. West Little Llagas Creek widening and deepening from Hillwood Lane to Llagas Road (Reach 8).

  3. Underground twin box culvert construction through the intersection of Hale Avenue and Wright Avenue, including utility relocations

    1. Work requires full closure of the intersection of Hale Avenue and Wright Avenue beginning May 1, 2026.

  4. Spring Avenue box culvert construction which will require the closure of both lanes on Spring Ave. at West Little Llagas Creek and the adjoining trail.

Prior to May 1, 2026, additional public outreach will be conducted to inform the public of this upcoming work.

Here is a social media post explaining the work and a postcard with details about the work.

Project Information

The project is being constructed in several phases, each with specific sections (referred to as reaches on the map) where the proposed improvements will occur. Phase 1 was completed in April 2022, including creating a new wetland habitat at Lake Silveira and planting more than 45,000 native plants along the widened and deepened channel. In August 2024, Valley Water completed Phase 2A of the project, including constructing a 2,300-foot-long tunnel underneath downtown Morgan Hill. The final phase of the project, Phase 2B, is now under construction and expected to be completed in 2027.

The Phase 2B mailer is available with details about the work scheduled for each of the four reaches where construction will occur. 

Phase 1: Complete

Phase 1 of the Upper Llagas Creek Flood Protection Project was completed ahead of schedule in April 2022. Phase 1 project work included 4.4 miles of channel excavation, construction of the on-site compensatory mitigation at Lake Silveira wetlands, Masten Avenue Bridge concrete underpinning, Monterey Road Bridge concrete lining with a low flow channel for fish passage, installation of rock slope protection, storm drain outfall modifications, removal of concrete rubble, debris, and legacy trash, destruction of monitoring wells, installation of bat boxes, installation of permanent fencing and gates, removal of 12.5 acres of invasive blackberry bushes at Lake Silveira, planting of approximately 45,000 new, native plants on approximately 50 acres of Valley Water project property, and restoration of 2,000 linear feet of Llagas Creek adjacent to Lake Silveira The three-year native plant establishment and maintenance period was completed in March 2025.  Phase 1 construction contract Notice of Completion was accepted by the Valley Water Board of Directors on June 10, 2025.
Valley Water created a video of the completed wetlands and Llagas Creek restoration work. A story on this work is also available on the Valley Water News blog. 

In the 1970s, Lake Silveira was an active quarry, and presumably, as a result of those operations, there was a significant amount of abandoned concrete rubble dispersed on and adjacent to Llagas Creek. Valley Water removed the rubble and created new wetlands. The wetland habitat at Lake Silveira included creating islands, constructing habitat features, constructing side-weir inlet and outlet structures, and planting thousands of native wetland and riparian plants that will become habitat for birds, frogs, turtles, and other wildlife. The Land Trust of Santa Clara Valley is Valley Water’s long-term land management partner of the Lake Silveira wetlands.

During the 2020 and 2021 in-channel construction seasons, approximately 600,000 cubic yards (CY) of soil was excavated and removed from Upper Llagas Creek from Reaches 4, 5, 7A, and a portion of Reach 6 to increase the capacity of the creek channel during storm events. Rock slope protection was placed at existing bridge abutments for erosion and scour protection. Approximately 75,000 CY of nutrient-rich topsoil was placed along the creek banks to help support the dozens of acres of newly planted native riparian vegetation. Instream complexities, such as coarse woody debris and rootwad-log structures, were installed along the creek bottom throughout Phase 1 to serve as future habitat for native wildlife.

Valley Water entered into a cost-sharing agreement with the City of Morgan Hill in October 2020 to construct a public trail within Reach 7A.  Valley Water completed the paved trail on behalf of the city. The city completed the construction of new pedestrian crosswalks at Middle Avenue and Watsonville Avenue. The project is an example of Valley Water’s commitment to restoring wildlife habitat and providing open space for public use.

Phase 2A: Complete

Phase 2A construction began in June 2021 in a portion of Reach 8 in downtown Morgan Hill. Phase 2A included approximately 2,300 linear feet of a horseshoe-shaped underground tunnel 14 x 12 feet and approximately 1,600 linear feet of 10 ft x 9 ft twin reinforced concrete box culverts upstream and downstream of the tunnel to carry high water flows. Low flows will remain within the existing creek that traverses through downtown Morgan Hill.  The Phase 2A construction contract Notice of Completion was accepted by the Valley Water Board of Directors on January 28, 2025.

Valley Water entered into a cost-sharing agreement with the City of Morgan Hill in April 2021 to construct an approximate 600-foot portion of the City’s Hale Avenue Extension Project, including a fully signalized intersection at West Main Avenue as part of Phase 2A. Valley Water utilized the City property as a staging area to construct the necessary flood protection improvements. Phase 2A is an example of the cooperation and commitment of Valley Water and the City to save public funds while minimizing impacts to the community.

Phase 2B: in construction through spring 2027

Phase 2B construction consists of approximately 1,900 linear feet of twin reinforced concrete box culverts (10 ft x 9 ft), creek modifications and excavation by widening and deepening, installation and modification of culverts at various street crossings, construction of an inlet basin weir split-flow structure to divert high creek flows, and support of existing bridges by underpinning. Valley Water will construct improvements on approximately eight (8) miles of Upper Llagas Creek, from US 101 upstream to Llagas Road. Construction will include creek widening and deepening, bridge/culvert construction, traffic control, utility coordination and relocation, construction of maintenance roads, and habitat enhancements. Construction is expected to be completed in spring 2027.

After the project's completion in spring 2027, a three-year post-construction mitigation native plant revegetation period will follow.
Valley Water and Boy Scout Troop 730 
In May 2023, Morgan Hill Boy Scout Troop 730 constructed a bat roost adjacent to Lake Silveira. The construction was the culmination of many days of planning and preparation for the bat roost. Approximately 15 troop and community members helped at various stages of the project.

Scout Troop 730 searches for a location to install the bat roost.
Scout Troop 730 searches for a location to install the bat roost.
Scout digs the hole for the post.
Scout digs the hole for the post.

Scouts working at the site

Volunteers and troops design the bat roost.

Volunteers and troops design the bat roost

Volunteers help with the roost.

Volunteers help with the roost

The bat roost is done and installed. THANK YOU!

For more information:

  • Stephen M. Ferranti, P.E., (408) 630-2677
     
  • Jose Villarreal, (408) 630-2879
     
  • Sign up to receive project updates via email.
     
  • Use "Access Valley Water" to submit questions, complaints or compliments.
Safe Clean Water and Natural Flood Protection Interactive Map

 

Hale Avenue detour to be in place through the end of October 2025.

 

Detour map for Edes St., Cosmo Ave., and Spring Ave. closures.

 

Temporary West Little Llagas Creek trail entrances closures and detour.

 

Map of the various reaches where flood protection elements are being built. Click to enlarge the map.

 

Newly planted wetland and upland plants at Valley Water’s recently created Lake Silveira wetlands near Llagas Creek and Monterey Road in Morgan Hill (April 2022)
Newly planted wetland and upland plants at Valley Water’s recently created Lake Silveira wetlands near Llagas Creek and Monterey Road in Morgan Hill (April 2022)

 

Upper Llagas Phase 1 bridge underpinning (June 2020)
Upper Llagas Phase 1 bridge underpinning (June 2020)

 

Upper Llagas Phase 2A finished tunnel
Upper Llagas Phase 2A finished tunnel

 

Upper Llagas Phase 2A RCB construction
Upper Llagas Phase 2A RCB construction

Pursuant to the California Environmental Quality Act, Valley Water, as the lead agency for the Project, has prepared a Final Environmental Impact Report (FEIR) to evaluate environmental impacts of the proposed Project

  • Final Environmental Impact Report
     
  • Draft Environmental Impact Report, May 19, 2014
    • Pages 1-244 of DEIR
    • Part 1 of 2: Pages 245-1354
    • Part 2 of 2: Pages 245-1354
    • Pages 1355-1630

Additional reports related to the Project can be found by clicking on the link below:

  1. Geotechnical Report (2006)
     - Part 1
     - Part 2
  2. Site Characterization Report (2012)
  3. Reach 4 and 5 Limited Phase II ESA (2003)
  4. Reach 4, 5, 6, and 7B – Phase I ESA Vol 1 (2003)
  5. Reach 4, 5, 6, and 7B – Phase I ESA Vol 2 (2003)
     - Part 1
     - Part 2
  6. Reach 5 and 6 – Phase I ESA (2002)
  7. Reach 8 – Phase I ESA (2003)
  8. Reach 14 – Phase I ESA(2005)

September Pre-construction Public Meeting

Valley Water held a pre-construction meeting on September 3, 2024, to update the community on the anticipated construction impacts and measures Valley Water will take to mitigate and reduce these disturbances. A question-and-answer session followed the presentation. Below is a recording of the meeting and a copy of the presentation slides. 

  • Meeting recording
  • Slide presentation

 

Safe, Clean Water Program Documents

  • FY25 Annual Report
  • All annual reports, annual IMC audit reports and independent audits

Regulatory Compliance

  • Upper Llagas Creek 401 Certification Training 8 30 19 

​Previous Project Mailers

  1. The May 2021 Upper Llagas Creek Phase 2A project mailer
  2. The September 2019 Upper Llagas Creek Phase 1 project mailer
  3. Project brochure and inserts for Phase 1: Brochure   Insert 1   Insert 2

 

FY22-36 Key Performance Indicator for the Safe, Clean Water Program 

  1. Preferred project with federal and local funding: Plan, design and construct flood protection improvements along 13.9 miles of Upper Llagas Creek from Buena Vista Avenue to Llagas Road to provide flood protection to 1,100 homes, 500 businesses, and 1,300 agricultural acres, while improving stream habitat.
  2. With local funding only: Construct flood protection improvements along Llagas Creek from Buena Vista Avenue to Highway 101 in San Martin (Reaches 4 and 5 (portion)), Monterey Road to Watsonville Road in Morgan Hill (Reach 7a), approximately W. Dunne Avenue to W. Main Avenue (portion of Reach 8), and onsite compensatory mitigation at Lake Silveira.

Benefits

  • Provides 1% flood capacity for four (4) miles along West Little Llagas Creek within downtown Morgan Hill, protecting approximately 1,100 homes and 500 businesses
  • Provides 10% (10-year event) flood protection to approximately 1,300 agricultural acres in Morgan Hill, Gilroy and San Martin
  • Locally funded project provides improved flood protection for a limited number of homes and businesses in Morgan Hill
  • Improves stream habitat and fisheries
  • Creates additional wetlands
  • Improves stream water quality
  • Identifies opportunities to integrate recreation improvements with the City of Morgan Hill and others as appropriate
  • Addresses climate change as the project is designed to increase flow capacity, thereby reducing flood risks from storm events projected to become more frequent and intense due to climate change. Additionally, Valley Water considered the implications of sea level rise (SLR) and determined that the project is outside SLR impact reach

Geographic Area of Benefit

Morgan Hill, San Martin and Gilroy 

Flooding History

The area sustained damage in 1937, 1955, 1958, 1962, 1963, 1969, 1982, 1986, 1996, 1997, 1998, 2002, 2004, 2008, 2009, and 2011. In 2009, many businesses and residences in downtown Morgan Hill were flooded under 1 foot of water.

Project Background

The Upper Llagas Creek Flood Protection Project was initially part of the voter-approved Clean, Safe Creeks and Natural Flood Protection Plan (CSC Plan) that came into effect in Fiscal Year 2001-2002 (FY02).

The project entailed providing 1% flood protection for approximately 4.5 miles of the channel in the urban area of Morgan Hill; the remaining 9.4 miles of the channel within the rural areas would have approximately 10% level of flood protection.

Due to very little federal funding for the project, in 2009, the Valley Water Board and the City of Morgan Hill decided to proceed with the project using only local funding while still working with the U.S. Army Corps of Engineers to secure federal funding. The City of Morgan Hill agreed to contribute up to $3 million towards the project design. As part of the CSC Plan, planning and 65% project design was completed.  Upon certification of the Environmental Impact Report in June 2014, VW began acquisition of more than 100 parcels required for construction.

Voters Approve 2012 Safe, Clean Water Program

In November 2012, voters approved the 15-year Safe, Clean Water and Natural Flood Protection Program (2012 Program), which replaced the CSC Plan. The project was carried forward into the 2012 Program with two key performance indicators (KPIs). The preferred project with federal and local funding entailed providing flood protection to 1,100 homes, 500 businesses, and 1,300 agricultural acres while improving stream habitat. The local-funding only project focused on providing 100-year flood protection for Reach 7 only (up to W. Dunne Avenue in Morgan Hill).

In 2020, the Valley Board modified the local-funding-only KPI #2 to “Construct flood protection improvements along Llagas Creek from Buena Vista Avenue to Highway 101 in San Martin (Reaches 4 and 5 (portion), Monterey Road to Watsonville Road in Morgan Hill (Reach 7a), approximately W. Dunne Avenue to W. Main Avenue (portion of Reach 8), and onsite compensatory mitigation at Lake Silveira.”

The modification increased the length of the locally funded project from approximately 2.9 miles to 4.9 miles in addition to constructing the onsite compensatory mitigation. Besides getting the most out of the available local dollars, this approach kept the project moving forward, shortening the construction window without inducing flooding downstream. This modification maximized the potential for external funding opportunities and also reflected improved collaboration with regulatory permitting agencies that require early mitigation for the project impacts. Details about the modification can be found at https://www.valleywater.org/sites/default/files/SCW_FY19%20ModificationsWithAttachments.pdf.

As part of the 2012 Program, Valley Water began Phase 1 construction in FY20 and Phase 2A in FY21.

Voters Approve the Renewed Safe, Clean Water Program

In November 2020, voters approved the renewed Safe, Clean Water and Natural Flood Protection Program (Safe, Clean Water Program), replacing the 2012 Program. The project has continued in the renewed Safe, Clean Water Program.

About the Safe, Clean Water and Natural Flood Protection Program

In November 2020, voters in Santa Clara County overwhelmingly approved Measure S, a renewal of Valley Water’s Safe, Clean Water and Natural Flood Protection Program.

The program was first passed by voters in 2000 as the Clean, Safe Creeks and Natural Flood Protection Plan, then again in 2012 as the Safe, Clean Water and Natural Flood Protection Program. The renewal of the Safe, Clean Water Program will continue to provide approximately $47 million annually for local projects that deliver safe, clean water, natural flood protection, and environmental stewardship to all the communities we serve in Santa Clara County.

While evaluating ways to improve the 2012 program, Valley Water gathered feedback from more than 21,000 community members. That helped Valley Water create the six priorities for the renewed Safe, Clean Water Program, which are:

Priority A: Ensure a Safe, Reliable Water Supply

Priority B: Reduce Toxins, Hazards and Contaminants in our Waterways

Priority C: Protect our Water Supply and Dams from Earthquakes and Other Natural Disasters

Priority D: Restore Wildlife Habitat and Provide Open Space

Priority E: Provide Flood Protection to Homes, Businesses, Schools, Streets and Highways

Priority F: Support Public Health and Public Safety for Our Community

Each year, Valley Water prepares a report providing a progress update for each of these program priorities, along with fiscal year accomplishments.

To ensure transparency and accountability to the voters, the ballot measure also created an Independent Monitoring Committee, appointed by the Santa Clara Valley Water District Board of Directors. The Independent Monitoring Committee annually reviews the program’s progress to ensure the outcomes are achieved in a cost-efficient manner and reports its findings to the Board. Additionally, the IMC also reviews each proposed 5-year implementation plan prior to its submittal for Board approval.

In addition, the program requires three independent audits.

View the Safe, Clean Water Program’s annual reports, annual IMC audit reports, and independent audits, including a staff response, on the Valley Water website.

 

Footer Top

    Valley Water Logo
  • Report an Issue
  • Contact Us
  • Services & Support
  • Join our Newsletter
    Valley Water Logo
  • Join our Newsletter
  • Report an Issue
  • Contact Us
  • Services & Support

Footer

  • For Residents
    • Water Charges
    • Grants and Rebates
    • Water Conservation
    • Projects and Plans
    • Outdoor Survey
    • Watersavings.org
    • Water Quality
    • Water Supply Planning
  • In an Emergency
    • Get Flood Ready
    • Levee Safety
    • Dam Safety Program
    • Flood Emergency Action Plan
    • Local Hazard Mitigation Area
    • Climate Change Action Plan
  • Data & Resources
    • GIS Data
    • Popular Documents
    • HEC-2 Data Library
    • Surface Water Data Portal
    • Water Sensor ALERT
    • Find My Water Retailer
  • About Valley Water
    • Finance & Budget
    • Board of Directors
    • Board Meetings & Agendas
    • Committees
    • Board Governance Policies
    • Careers
    • Internships
  • In the District
    • Permits
    • Report a Problem
    • Contact Us
    • Purchasing and Contracts
    • Construction Administration
    • Business Resources
  • Learning Center
    • Water 101 Academy
    • Public Tours
    • Adopt a Creek
Santa Clara Valley Water District 2025
Pollution Hotline 888-510-5151
Phone: 408-265-2600